Stavebnicový systém MB 9 - EN
218 6 Clamp-Profile Hangers E 6 8 a 4.75 mm 8.25 mm 8 33 13 Clamp-Profile Hanger 8 E 4 bolts, St, bright zinc-plated 4 washers DIN EN ISO 7093-8.4, St, bright zinc-plated 4 T-Slot Nuts 8 St M8, bright zinc-plated m = 112.0 g 1 set 0.0.440.05 7.6 30 13 Clamp-Profile Hanger 6 E 4 bolts, St, bright zinc-plated 4 washers DIN 9021-6.4, St, bright zinc-plated 4 T-Slot Nuts 6 St M6, bright zinc-plated m = 76.0 g 1 set 0.0.441.11 The clearance dimension between frame and Stand Profile is 12 mm. Dimensional tolerances of ± 3 mm can be accommo- dated by the Clamp-Profile Hanger E. Installation sequence: 1. Hook the frame element into the existing construction. 2. Fix the height of the frame element using the upper hangers (a). 3. Move the lower Clamp-Profile Hangers to lock the frame element in position (if required). Clamp-Profile Hangers E ■ ■ For suspending frame elements assembled with Clamp-Profile Fasteners E To match Clamp-Profile Hangers E, item supplies Clamp-Profile Fasteners E, which also hold together the frame elements. This means that a smaller gap (12 mm) can be achieved between the frame and the stands. E N C L O S U R E S , G U A R D S A N D P A R T I T I O N S
Made with FlippingBook
RkJQdWJsaXNoZXIy NTk1NjQ0