The Lean Production Building Kit System

46 l &4% 182 l ⌀30 51 Ø5 Ø30 Slide Link D30 220 &4% 2 Slide Links 220, St, stainless 2 tubing cut-offs, CR, black l = 220 mm m = 280.0 g 1 set 0.0.658.77 Slide Link D30 330 &4% 2 Slide Links 330, St, stainless 2 tubing cut-offs, CR, black l = 330 mm m = 348.0 g 1 set 0.0.658.76 Slide Link D30 440 &4% 2 Slide Links 440, St, stainless 2 tubing cut-offs, CR, black l = 440 mm m = 416.0 g 1 set 0.0.658.75 The length of the Slide Links has been matched to the dimensions of transport boxes. An additional section of tubing secures the top ends of the wire against lateral movement. ■ Simple container provision with stop ■ Installed quickly on all (Profile) Tubes D30 ■ Fits around Roller Conveyor Fastening Brackets up to 40 mm wide Slide Link D30 Getting containers close to hand really can be this easy: As they reach the end of the conveyor line, small load carriers glide over Slide Links D30 on the last stretch and are securely held in place by the integrated stop. These steel elements are available to suit containers with a depth of 200, 300 or 400 mm in the direction of travel. Slide Links D30 are incredibly easy to install. They are simply hung between two (profile) tubes. The top end can be fitted over Roller Conveyor Fastening Brackets that are 40 mm wide and have already been screwed into place. This means they can also be used to retrofit an angled removal point. MATERIAL FLOW

RkJQdWJsaXNoZXIy NTk1NjQ0